New 20mx 40m Arena Construction

Posted on 9th January 2026

Construction of a new 20m x 40m Riding Arena in Taunton Somerset.
Showing earthmoving and formation done with drainage and setting out posts.
Extra geo laid for a track alongside.
Bringing onto site materials for post and rail fencing.
Surface laid and levelled consisting of equestrian super fine sand and synthetic fibres.
Fencing and topsoiling around the perimeter levelled and finalised.
Client very happy and riding for the first time.







Back To Blog »
© Copyright 2026 Perry James Equestrian Arenas | Privacy PolicyWeb Design By Toolkit Websites