25m x 60m Arena at Chulmleigh in Devon.
A challenging project to construct and work on after a very bad wet winter with snow and ice. Surrounding area was nicely landscaped with the wet topsoil and a stone track was also installed from te stables to the arena to prevent contamination.
Site Topsoil Stripping.
The working area and arena site was stripped of topsoil and stockpiled nearby for re use later on.
Drainage done and drainage blanket levelled perfecrtly. Fencing done and awaiting delivery of sand from dorset.
Job Done!
Dorset equestrian super fine silica sand delivered and installed. Fibres mixed in from the bales and topsoiling levelled and landscaped to finnish.